top of page
Search

Work completed in Dallas, GA!

  • Writer: Merlin Fueling
    Merlin Fueling
  • May 11
  • 1 min read

In Dallas, GA, we recently tackled a comprehensive project involving the critical task of plumbing four dispensers and managing the dewatering and ballasting of two substantial 15,000-gallon underground storage tanks (USTs). Our team meticulously installed the product piping, connecting the UST system to each dispenser. Simultaneously, we expertly dewatered and ballasted the two USTs, ensuring full compliance with all manufacturer specifications for tank integrity. This complex operation, executed with precision and adherence to all project drawings, specifications, and safety standards, ensures the optimal performance and longevity of your fuel infrastructure. For any underground storage tank needs or plumbing services, don't hesitate to reach out! We're ready to serve. Give us a buzz or shoot us a text at 470-309-7202 to schedule your next service – we love talking tanks!

 
 
 

Recent Posts

See All
Work completed in Kingston, GA!

The technician replaced a faulty thermostat to resolve an operational issue. This ensures the system functions correctly.

 
 
 
Work completed in Kingston, GA!

Our technician conducted a thorough maintenance check on the heating system, addressing component cleaning, lubrication, and safety verification. The service ensured optimal performance and reliabilit

 
 
 
Work completed in Kingston, GA!

Our technician conducted a thorough inspection and maintenance of the client's HVAC system. All components were checked, and the system was confirmed to be in optimal working condition following the s

 
 
 

Comments


  • LinkedIn

Merlin Fueling

25 W. Main St. #101

Kingston, GA 30145

470-309-7202

Veeder-Root Gilbarco Passport Verifone Commander Ruby2 C18 Wayne Dover OPW Emco UST 

bottom of page