top of page
Search

Work completed in Cartersville, GA!

  • Writer: Merlin Fueling
    Merlin Fueling
  • 4 days ago
  • 1 min read

When the gas side needed a new reset contact and the diesel side E-stop required a bushing, our expert technician rolled up their sleeves. After a controlled site shutdown, the gas side box was expertly mounted, and the necessary bushing was precisely fitted to the diesel E-stop. A thorough functional test of both the E-stop and reset confirmed everything was running smoothly. Is your industrial equipment acting up? Give us a shout at 470-309-7202 for a text or call – we'll get you back online faster than you can say 'routine maintenance!'

 
 
 

Recent Posts

See All
Work completed in Jonesboro, GA!

Technicians successfully removed 15 gallons of liquid and debris from a diesel tank. This service ensures optimal performance and longevity of the fuel system.

 
 
 
Work completed in Lindale, GA!

Technicians completed scheduled CP testing on three tanks and performed necessary repairs and upgrades. Work included replacing drop tubes with flapper-style overfill prevention valves and installing

 
 
 
Work completed in Cartersville, GA!

Technicians successfully replaced a damaged fuel dispenser, ensuring all connections and programming were completed. The new unit has been installed and tested, with a follow-up visit scheduled for ca

 
 
 

Comments


  • LinkedIn

Merlin Fueling

25 W. Main St. #101

Kingston, GA 30145

470-309-7202

Veeder-Root Gilbarco Passport Verifone Commander Ruby2 C18 Wayne Dover OPW Emco UST 

bottom of page